Project guide
Gravel walkway
A path that lasts is a compacted base under a compacted top course, held in by an edge. The stone you see is the smaller half of the order.
- TimeA weekend for a garden path
- DifficultyModerate: the digging is the work
How much gravel do I need for a path?
- Road base at 6 inches: one cubic yard covers about 54 square feet at 6 inches, so 300 square feet takes about 6 cubic yards (roughly 7.8 tons).
- Crusher fines at 3 inches: one cubic yard covers about 108 square feet at 3 inches, so 300 square feet takes about 3 cubic yards (roughly 3.9 tons).
What the job involves
Digging out to the combined depth of both layers, laying and compacting a base course, then a finer top course compacted over it, with edging on both sides. A weekend for a garden path; the digging is the work.
What you need, and roughly how much
Road base
The base course, compacted
6 inches base course under a gravel or crushed-stone path, compacted
Crushed rock with fines, laid and compacted, is what a park department specifies under a crushed-stone path: 6 inches of base course, mechanically compacted. Recycled concrete does the same job and looks identical once it is buried.
One cubic yard covers about 54 square feet at 6 inches, so 300 square feet takes about 6 cubic yards (roughly 7.8 tons).
Does the same job at this layer: Recycled concrete.
5 listed yards publish a price for this.
Crusher fines
The top course you walk on
3 inches path top course over a compacted base course
Angular crushed stone graded down to dust locks together when it is wetted and compacted, into a surface a wheelbarrow and a stroller can cross. The top course goes on at 3 inches over the base. Laid straight onto fabric with no base course, trail builders use more, within a range of 3 to 6 inches.
One cubic yard covers about 108 square feet at 3 inches, so 300 square feet takes about 3 cubic yards (roughly 3.9 tons).
Not for: Pea gravel, or any rounded stone, for a surface you walk on: rounded particles do not interlock and give a loose, unconsolidated surface.
5 listed yards publish a price for this.
What else you will need
- Edging: steel, aluminium, or a soldier course of brick. Not sold here.
- A plate compactor, half a day from a rental yard. Hand tamping works on a narrow path and is honest work.
- Woven landscape fabric between soil and base.
How to do it
- Mark the path and dig out to the depth of both layers together, keeping the bottom flat and the sides clean.
- Lay woven fabric across the bottom and up the sides, so the base cannot work down into the soil.
- Set edging along both sides, to finished height.
- Fill 6 inches of road base, wetting lightly and compacting with the plate compactor as you go.
- Top with 3 inches of crusher fines, rake level, wet it, and compact again.
- Leave it a day before you walk on it hard.
Common mistakes
No base course
The top course is thin on purpose; what carries a wheelbarrow is the compacted base under it. The park standard this guide follows puts more material in the base than in the surface, and compacts both.
Rounded stone on a path you walk
It looks wonderful in the photograph and it is miserable underfoot. Rounded particles do not interlock, so the surface stays loose and unconsolidated; angular fines pack.
Compacting it dry
Fines bind when they are wetted and then compacted; dry material stays loose. Wet each layer lightly, full depth, then compact.